COMPLETED PROJECTS
Accomplishments
ELECTRICAL TESTING 11KV FOR CYPARK SMART WTE
March 4, 2021
The purpose of electrical installation testing is primarily to ensure that people and goods are kept safe and are protected in the event of a fault. It also facilitates preventive maintenance of installations, preventing serious faults which might prove expensive (production shutdown, etc.).
SERVICE AND COMMISSIONING PLANT DISTRIBUTED CONTROL SYSTEM
February, 2021
FTSB undertake the role to perform the services to power-up and check the delivered Distributed Control System (DCS) to Malaysian Environmental Resources (MES) site at Ladang Tanah Merah, Negeri Sembilan. Our team check, verify and report the readiness status of the DCS, and its health condition where this system consists of 4 Operator Workstations, 1 Engineering/Operator Workstation, 2 Database servers, Safety Instrumented System Server and other accessories.
JIMAH EAST POWER STATION
February, 2021
SOLAR NEM ROOFTOP PROJECT
December, 2020
PETRONAS INSTEP
November, 2020